Clos de Gabourellerie
This project consisted of the demolition of agricultural sheds and replacing them with four dwellings.
Beaumont Structural Consultants were responsible for the design and detailing of the superstructure for the four new dwellings. BSC also designed the storm water drainage system by using a soakaway system.